Bison Generation Station / CA2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 263 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2d1a97279544063166e27eff |
| Net Summer Capacity (MW) | 320 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2d1a97279544063166e27eff |
| Net Winter Capacity (MW) | 325 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2d1a97279544063166e27eff |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 1307 |
| Entity Name | Basin Electric Power Coop |
| Plant ID | 69071 |
| Plant Name | Bison Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ND |
| County | Williams |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | CA2 |
| Unit Code | CC2 |
| Nameplate Capacity (MW) | 263 |
| Net Summer Capacity (MW) | 320 |
| Net Winter Capacity (MW) | 325 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 3 |
| Planned Operation Year | 2030 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 48.327932 |
| Longitude | -103.3127 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:2052 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1643
Sources EV-3676d255ec3716a7c83f23cbEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dc3bc3c0665a41be915cb9f39ad4d35bb30595329ea2cd3e878638797a6aee85
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:2052
Sources EV-2d1a97279544063166e27effEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 45ea28252254cd97aa2e8ceaa455664c1046f14acd9c19ded23b81d78c7ceced
Usage terms US government public domain