Bison Generation Station / CA2
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 263 MW | 원출처 열 정의 · 발전기 · (L) Regulatory approvals pending. Not under construction 기준일 2026-08 근거 EV-2d1a97279544063166e27eff |
| Net Summer Capacity (MW) | 320 MW | 원출처 열 정의 · 발전기 · (L) Regulatory approvals pending. Not under construction 기준일 2026-08 근거 EV-2d1a97279544063166e27eff |
| Net Winter Capacity (MW) | 325 MW | 원출처 열 정의 · 발전기 · (L) Regulatory approvals pending. Not under construction 기준일 2026-08 근거 EV-2d1a97279544063166e27eff |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 1307 |
| Entity Name | Basin Electric Power Coop |
| Plant ID | 69071 |
| Plant Name | Bison Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ND |
| County | Williams |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | CA2 |
| Unit Code | CC2 |
| Nameplate Capacity (MW) | 263 |
| Net Summer Capacity (MW) | 320 |
| Net Winter Capacity (MW) | 325 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 3 |
| Planned Operation Year | 2030 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 48.327932 |
| Longitude | -103.3127 |
| 원문 상태 | (L) Regulatory approvals pending. Not under construction |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2052 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:1643
근거 EV-3676d255ec3716a7c83f23cb자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dc3bc3c0665a41be915cb9f39ad4d35bb30595329ea2cd3e878638797a6aee85
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:2052
근거 EV-2d1a97279544063166e27eff자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 45ea28252254cd97aa2e8ceaa455664c1046f14acd9c19ded23b81d78c7ceced
