POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Bison Generation Station / CA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)263 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2d1a97279544063166e27eff
Net Summer Capacity (MW)320 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2d1a97279544063166e27eff
Net Winter Capacity (MW)325 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2d1a97279544063166e27eff
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID69071
Plant NameBison Generation Station
Google MapMap
Bing MapMap
Plant StateND
CountyWilliams
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDCA2
Unit CodeCC2
Nameplate Capacity (MW)263
Net Summer Capacity (MW)320
Net Winter Capacity (MW)325
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Planned Operation Month3
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude48.327932
Longitude-103.3127
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:2052

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1643

Sources EV-3676d255ec3716a7c83f23cb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dc3bc3c0665a41be915cb9f39ad4d35bb30595329ea2cd3e878638797a6aee85

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2052

Sources EV-2d1a97279544063166e27eff
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 45ea28252254cd97aa2e8ceaa455664c1046f14acd9c19ded23b81d78c7ceced

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Bison Generation Station / CA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID69071
Plant NameBison Generation Station
Google MapMap
Bing MapMap
Plant StateND
CountyWilliams
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDCA2
Unit CodeCC2
Nameplate Capacity (MW)263
Net Summer Capacity (MW)320
Net Winter Capacity (MW)325
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Planned Operation Month3
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude48.327932
Longitude-103.3127
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:2052

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2052

Sources EV-2d1a97279544063166e27eff
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 45ea28252254cd97aa2e8ceaa455664c1046f14acd9c19ded23b81d78c7ceced

Usage terms US government public domain

Source snapshots by date · USA · eia860

Bison Generation Station / CA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1307
Utility NameBasin Electric Power Coop
Plant Code69071
Plant NameBison Generation Station
StateND
CountyWilliams
Generator IDCA2
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCA
Unit CodeCC2
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)263
Nameplate Power Factor0.85
Summer Capacity (MW)320
Winter Capacity (MW)325
StatusL
Effective Month3
Effective Year2030
Current Month3
Current Year2030
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1643

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1643

Sources EV-3676d255ec3716a7c83f23cb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dc3bc3c0665a41be915cb9f39ad4d35bb30595329ea2cd3e878638797a6aee85

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel