Smarr Combined Cycle Energy Facility / 2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 345 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-48a2e0e93ccfe47797f4b01b |
| Net Summer Capacity (MW) | 304 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-48a2e0e93ccfe47797f4b01b |
| Net Winter Capacity (MW) | 309 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-48a2e0e93ccfe47797f4b01b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 68546 |
| Plant Name | Smarr Combined Cycle Energy Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Monroe |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 2 |
| Unit Code | 1 |
| Nameplate Capacity (MW) | 345 |
| Net Summer Capacity (MW) | 304 |
| Net Winter Capacity (MW) | 309 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CC |
| Planned Operation Month | 6 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.975936 |
| Longitude | -83.84369 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1917 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1392
Sources EV-399c2581f43fe3dd95170ff8Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d54c0047888eddae753a6b68da374c3ba59edb50b6a69700b2dc493a33557fa
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1917
Sources EV-48a2e0e93ccfe47797f4b01bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3e32170b6f0bfd35898c95a359d6417961206eeabe356481df5e5a4fcfa1bc21
Usage terms US government public domain