Smarr Combined Cycle Energy Facility / 2
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 345 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-48a2e0e93ccfe47797f4b01b |
| Net Summer Capacity (MW) | 304 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-48a2e0e93ccfe47797f4b01b |
| Net Winter Capacity (MW) | 309 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-48a2e0e93ccfe47797f4b01b |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 68546 |
| Plant Name | Smarr Combined Cycle Energy Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Monroe |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 2 |
| Unit Code | 1 |
| Nameplate Capacity (MW) | 345 |
| Net Summer Capacity (MW) | 304 |
| Net Winter Capacity (MW) | 309 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CC |
| Planned Operation Month | 6 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.975936 |
| Longitude | -83.84369 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1917 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:1392
근거 EV-399c2581f43fe3dd95170ff8자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d54c0047888eddae753a6b68da374c3ba59edb50b6a69700b2dc493a33557fa
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:1917
근거 EV-48a2e0e93ccfe47797f4b01b자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3e32170b6f0bfd35898c95a359d6417961206eeabe356481df5e5a4fcfa1bc21
