Biglow Solar Generation and BESS / BIGL1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 125 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2fcfb8df93edc9a1e2df5196 |
| Net Summer Capacity (MW) | 125 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2fcfb8df93edc9a1e2df5196 |
| Net Winter Capacity (MW) | 125 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-2fcfb8df93edc9a1e2df5196 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66712 |
| Entity Name | BIGL bn, LLC |
| Plant ID | 68316 |
| Plant Name | Biglow Solar Generation and BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OR |
| County | Sherman |
| Balancing Authority Code | PGE |
| Sector | IPP Non-CHP |
| Generator ID | BIGL1 |
| Nameplate Capacity (MW) | 125 |
| Net Summer Capacity (MW) | 125 |
| Net Winter Capacity (MW) | 125 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 45.606 |
| Longitude | -120.625 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1314 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1242
Sources EV-aeb74fcdf49a238a0b4516b8Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 206d05fcaf4eb3bb65204e3ec42f166d202cd37a0e93f5409ae2347b3ee7ce55
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1314
Sources EV-2fcfb8df93edc9a1e2df5196Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e5268eacaa441698661f99a17e473992f12d819e9f8914e73fec5606d2998671
Usage terms US government public domain
