United States of America · Generator · plant location

Biglow Solar Generation and BESS / BIGL2

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
BIGL bn, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
45.606, -120.625

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Biglow Solar Generation and BESS / BIGL2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b362c45fc4e024a99ebd7191
Net Summer Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b362c45fc4e024a99ebd7191
Net Winter Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b362c45fc4e024a99ebd7191
Detailed source fields
Original source fieldPublished value or condition
Entity ID66712
Entity NameBIGL bn, LLC
Plant ID68316
Plant NameBiglow Solar Generation and BESS
Google MapMap
Bing MapMap
Plant StateOR
CountySherman
Balancing Authority CodePGE
SectorIPP Non-CHP
Generator IDBIGL2
Nameplate Capacity (MW)125
Net Summer Capacity (MW)125
Net Winter Capacity (MW)125
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude45.606
Longitude-120.625
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1315

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1243

Sources EV-d2dce85c7890177ba735138c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5196b945dc5923f4a4acc575e7efbe4b49f91fa216aaf5127b3010edf328a6b3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1315

Sources EV-b362c45fc4e024a99ebd7191
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a13de0219a068fbbd102439f5bda4a2f450801dd8b89e8f9bb275568d7feca82

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel