Biglow Solar Generation and BESS / BIGL1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2fcfb8df93edc9a1e2df5196
Net Summer Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2fcfb8df93edc9a1e2df5196
Net Winter Capacity (MW)125 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-2fcfb8df93edc9a1e2df5196
Detailed source fields
Original source fieldPublished value or condition
Entity ID66712
Entity NameBIGL bn, LLC
Plant ID68316
Plant NameBiglow Solar Generation and BESS
Google MapMap
Bing MapMap
Plant StateOR
CountySherman
Balancing Authority CodePGE
SectorIPP Non-CHP
Generator IDBIGL1
Nameplate Capacity (MW)125
Net Summer Capacity (MW)125
Net Winter Capacity (MW)125
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude45.606
Longitude-120.625
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1314

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1242

Sources EV-aeb74fcdf49a238a0b4516b8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 206d05fcaf4eb3bb65204e3ec42f166d202cd37a0e93f5409ae2347b3ee7ce55

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1314

Sources EV-2fcfb8df93edc9a1e2df5196
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e5268eacaa441698661f99a17e473992f12d819e9f8914e73fec5606d2998671

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Biglow Solar Generation and BESS / BIGL1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID66712
Entity NameBIGL bn, LLC
Plant ID68316
Plant NameBiglow Solar Generation and BESS
Google MapMap
Bing MapMap
Plant StateOR
CountySherman
Balancing Authority CodePGE
SectorIPP Non-CHP
Generator IDBIGL1
Nameplate Capacity (MW)125
Net Summer Capacity (MW)125
Net Winter Capacity (MW)125
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude45.606
Longitude-120.625
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1314

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1314

Sources EV-2fcfb8df93edc9a1e2df5196
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e5268eacaa441698661f99a17e473992f12d819e9f8914e73fec5606d2998671

Usage terms US government public domain

Source snapshots by date · USA · eia860

Biglow Solar Generation and BESS / BIGL1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID66712
Utility NameBIGL bn, LLC
Plant Code68316
Plant NameBiglow Solar Generation and BESS
StateOR
CountySherman
Generator IDBIGL1
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)125
Summer Capacity (MW)125
Winter Capacity (MW)125
StatusL
Effective Month12
Effective Year2027
Current Month12
Current Year2027
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1242

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1242

Sources EV-aeb74fcdf49a238a0b4516b8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 206d05fcaf4eb3bb65204e3ec42f166d202cd37a0e93f5409ae2347b3ee7ce55

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel