Champaign BESS, LLC / CHMPN
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 202.7 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-9758c7e78853c1b45ba3772c |
| Net Summer Capacity (MW) | 202.7 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-9758c7e78853c1b45ba3772c |
| Net Winter Capacity (MW) | 202.7 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-9758c7e78853c1b45ba3772c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65144 |
| Entity Name | Samsung C&T Renewables, LLC |
| Plant ID | 67917 |
| Plant Name | Champaign BESS, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Glasscock |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | CHMPN |
| Nameplate Capacity (MW) | 202.7 |
| Net Summer Capacity (MW) | 202.7 |
| Net Winter Capacity (MW) | 202.7 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.871567 |
| Longitude | -101.7384 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:867 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:965
Sources EV-97198a3f80369323d384c003Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 aa669390582b6839ff17fd9129043615ba001f4b7490853fcf79e01adeed8c8d
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:867
Sources EV-9758c7e78853c1b45ba3772cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5c6fb3bb37976e4e1414bf8a3dd018f090292be3cdd613e499a279c302a9c756
Usage terms US government public domain
