United States of America · Generator · plant location

Conez Solar, LLC / CONEZ

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Samsung C&T Renewables, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
32.458353, -82.39457

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Conez Solar, LLC / CONEZ

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)150 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-c431631a9f806bf170ab9410
Net Summer Capacity (MW)150 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-c431631a9f806bf170ab9410
Net Winter Capacity (MW)150 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-c431631a9f806bf170ab9410
Detailed source fields
Original source fieldPublished value or condition
Entity ID65144
Entity NameSamsung C&T Renewables, LLC
Plant ID66671
Plant NameConez Solar, LLC
Google MapMap
Bing MapMap
Plant StateGA
CountyEmanuel
Balancing Authority CodeSOCO
SectorIPP Non-CHP
Generator IDCONEZ
Nameplate Capacity (MW)150
Net Summer Capacity (MW)150
Net Winter Capacity (MW)150
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month6
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.458353
Longitude-82.39457
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:857

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:696

Sources EV-50087680b4a4f7203a3a2638
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 df0bd00addf0a81c3b2eaa90c11e907c86c66fd124e6eb5a20531651af7e048c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:857

Sources EV-c431631a9f806bf170ab9410
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6c52ea885456cd2272aca232c805dcaf398a012b57e4cbbf4078a3637d8778ce

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel