Conez Solar, LLC / CONEZ
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c431631a9f806bf170ab9410 |
| Net Summer Capacity (MW) | 150 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c431631a9f806bf170ab9410 |
| Net Winter Capacity (MW) | 150 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c431631a9f806bf170ab9410 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 65144 |
| Entity Name | Samsung C&T Renewables, LLC |
| Plant ID | 66671 |
| Plant Name | Conez Solar, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Emanuel |
| Balancing Authority Code | SOCO |
| Sector | IPP Non-CHP |
| Generator ID | CONEZ |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.458353 |
| Longitude | -82.39457 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:857 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:696
근거 EV-50087680b4a4f7203a3a2638자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 df0bd00addf0a81c3b2eaa90c11e907c86c66fd124e6eb5a20531651af7e048c
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:857
근거 EV-c431631a9f806bf170ab9410자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6c52ea885456cd2272aca232c805dcaf398a012b57e4cbbf4078a3637d8778ce
