United States of America · Generator · plant location

Cumbia Energy Center / CECBA

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Mission Clean Energy Devco LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
27.739083, -97.44955

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Cumbia Energy Center / CECBA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Detailed source fields
Original source fieldPublished value or condition
Entity ID66369
Entity NameMission Clean Energy Devco LLC
Plant ID67768
Plant NameCumbia Energy Center
Google MapMap
Bing MapMap
Plant StateTX
CountyNueces
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCECBA
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude27.739083
Longitude-97.44955
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1012

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:916

Sources EV-dcf26fc913a7a55ed181ef67
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cdc446145a2b26f4a40fa4d195d5c1525778f526a2fa9a7f41fd8b1a0965cbce

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1012

Sources EV-2ce7f492d43dbebd0feed854
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 620a528421f995dd30a07772fae9a3e2e92ee75c7ee269d9054774de47a4067f

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel