Cumbia Energy Center / CECBA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2ce7f492d43dbebd0feed854 |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2ce7f492d43dbebd0feed854 |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-2ce7f492d43dbebd0feed854 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66369 |
| Entity Name | Mission Clean Energy Devco LLC |
| Plant ID | 67768 |
| Plant Name | Cumbia Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Nueces |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | CECBA |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 27.739083 |
| Longitude | -97.44955 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1012 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:916
Sources EV-dcf26fc913a7a55ed181ef67Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cdc446145a2b26f4a40fa4d195d5c1525778f526a2fa9a7f41fd8b1a0965cbce
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1012
Sources EV-2ce7f492d43dbebd0feed854Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 620a528421f995dd30a07772fae9a3e2e92ee75c7ee269d9054774de47a4067f
Usage terms US government public domain