Power assets and projects · USA · eia860m

Cumbia Energy Center / CECBA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-2ce7f492d43dbebd0feed854
Detailed source fields
Original source fieldPublished value or condition
Entity ID66369
Entity NameMission Clean Energy Devco LLC
Plant ID67768
Plant NameCumbia Energy Center
Google MapMap
Bing MapMap
Plant StateTX
CountyNueces
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCECBA
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude27.739083
Longitude-97.44955
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1012

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:916

Sources EV-dcf26fc913a7a55ed181ef67
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cdc446145a2b26f4a40fa4d195d5c1525778f526a2fa9a7f41fd8b1a0965cbce

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1012

Sources EV-2ce7f492d43dbebd0feed854
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 620a528421f995dd30a07772fae9a3e2e92ee75c7ee269d9054774de47a4067f

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cumbia Energy Center / CECBA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID66369
Utility NameMission Clean Energy Devco LLC
Plant Code67768
Plant NameCumbia Energy Center
StateTX
CountyNueces
Generator IDCECBA
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationWestside_V_B
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCWestside_V_B
Nameplate Capacity (MW)200
Nameplate Power Factor0.95
Summer Capacity (MW)200
Winter Capacity (MW)200
StatusP
Effective Month12
Effective Year2026
Current Month9
Current Year2027
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:916

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:916

Sources EV-dcf26fc913a7a55ed181ef67
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cdc446145a2b26f4a40fa4d195d5c1525778f526a2fa9a7f41fd8b1a0965cbce

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cumbia Energy Center / CECBA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID66369
Entity NameMission Clean Energy Devco LLC
Plant ID67768
Plant NameCumbia Energy Center
Google MapMap
Bing MapMap
Plant StateTX
CountyNueces
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCECBA
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude27.739083
Longitude-97.44955
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1012

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1012

Sources EV-2ce7f492d43dbebd0feed854
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 620a528421f995dd30a07772fae9a3e2e92ee75c7ee269d9054774de47a4067f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel