Bramble Energy Center / BECBA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 225.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc |
| Net Summer Capacity (MW) | 225.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc |
| Net Winter Capacity (MW) | 225.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66369 |
| Entity Name | Mission Clean Energy Devco LLC |
| Plant ID | 67767 |
| Plant Name | Bramble Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Zavala |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | BECBA |
| Nameplate Capacity (MW) | 225.1 |
| Net Summer Capacity (MW) | 225.1 |
| Net Winter Capacity (MW) | 225.1 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 4 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 28.955627 |
| Longitude | -99.72318 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1874 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:915
Sources EV-45b42662aa65b27a1cea331fEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 536e22eb8e6fa69ca4c07deaa249c47ed83363f47d2af2f4821625f814bb9c70
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1874
Sources EV-f6f401053ac7f862dacefbdcEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 19857b8aa219c64a2d37cb0802742ee64503a522983371acd047b43a5a349262
Usage terms US government public domain