Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Bramble Energy Center / BECBA
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
225.1 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc
Net Summer Capacity (MW)
225.1 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc
Net Winter Capacity (MW)
225.1 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f6f401053ac7f862dacefbdc
Detailed source fields
Original source field
Published value or condition
Entity ID
66369
Entity Name
Mission Clean Energy Devco LLC
Plant ID
67767
Plant Name
Bramble Energy Center
Google Map
Map
Bing Map
Map
Plant State
TX
County
Zavala
Balancing Authority Code
ERCO
Sector
IPP Non-CHP
Generator ID
BECBA
Nameplate Capacity (MW)
225.1
Net Summer Capacity (MW)
225.1
Net Winter Capacity (MW)
225.1
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
4
Planned Operation Year
2029
Status
(P) Planned for installation, but regulatory approvals not initiated
Latitude
28.955627
Longitude
-99.72318
Original text
(P) Planned for installation, but regulatory approvals not initiated