Timber Cove Solar / 59957
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 100 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f7c29ac0a86e9e1098a2707b |
| Net Summer Capacity (MW) | 100 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f7c29ac0a86e9e1098a2707b |
| Net Winter Capacity (MW) | 100 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-f7c29ac0a86e9e1098a2707b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65837 |
| Entity Name | Freestone Solar LLC |
| Plant ID | 66922 |
| Plant Name | Timber Cove Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Freestone |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 59957 |
| Nameplate Capacity (MW) | 100 |
| Net Summer Capacity (MW) | 100 |
| Net Winter Capacity (MW) | 100 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 5 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.870589 |
| Longitude | -96.15247 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1518 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:776
Sources EV-7a12699d6276e1e50662798eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f6b8a1a1b786544839a0efda070f4d90c969b9901a2612b282e8c007d3b88988
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1518
Sources EV-f7c29ac0a86e9e1098a2707bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9c516bbbae86fae31b654e5ee302e2fe8fc42210c869afa20c0228c44d9ecd36
Usage terms US government public domain