Timber Cove Solar / 59957
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-f7c29ac0a86e9e1098a2707b |
| Net Summer Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-f7c29ac0a86e9e1098a2707b |
| Net Winter Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-f7c29ac0a86e9e1098a2707b |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 65837 |
| Entity Name | Freestone Solar LLC |
| Plant ID | 66922 |
| Plant Name | Timber Cove Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Freestone |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 59957 |
| Nameplate Capacity (MW) | 100 |
| Net Summer Capacity (MW) | 100 |
| Net Winter Capacity (MW) | 100 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 5 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.870589 |
| Longitude | -96.15247 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1518 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:776
근거 EV-7a12699d6276e1e50662798e자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f6b8a1a1b786544839a0efda070f4d90c969b9901a2612b282e8c007d3b88988
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:1518
근거 EV-f7c29ac0a86e9e1098a2707b자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9c516bbbae86fae31b654e5ee302e2fe8fc42210c869afa20c0228c44d9ecd36
