KRS I Anahola Solar Hybrid / BESS8
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 12 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-86cd754e2ffb6e9b8de30d71 |
| Net Summer Capacity (MW) | 12 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-86cd754e2ffb6e9b8de30d71 |
| Net Winter Capacity (MW) | 12 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-86cd754e2ffb6e9b8de30d71 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 10071 |
| Entity Name | Kauai Island Utility Cooperative |
| Plant ID | 58639 |
| Plant Name | KRS I Anahola Solar Hybrid |
| Google Map | Map |
| Bing Map | Map |
| Plant State | HI |
| County | Kauai |
| Sector | Electric Utility |
| Generator ID | BESS8 |
| Nameplate Capacity (MW) | 12 |
| Net Summer Capacity (MW) | 12 |
| Net Winter Capacity (MW) | 12 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 22.131667 |
| Longitude | -159.3031 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:914 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:216
Sources EV-79fcc5879cb15a701156e2e9Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5c398f4e8a867c5b5a20524c970decee6b6b61ae5a67d0f796839146e7c5aab9
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:914
Sources EV-86cd754e2ffb6e9b8de30d71Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1032c06bd61f40838de581e443460c4ce9b4dbdceaf536d720905592df5a3163
Usage terms US government public domain