United States of America · Generator · plant location

KRS II Koloa Solar / BESS7

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Kauai Island Utility Cooperative
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
21.900833, -159.45

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

KRS II Koloa Solar / BESS7

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-1deab0d2df9a61f1d9ec59e2
Net Summer Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-1deab0d2df9a61f1d9ec59e2
Net Winter Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-1deab0d2df9a61f1d9ec59e2
Detailed source fields
Original source fieldPublished value or condition
Entity ID10071
Entity NameKauai Island Utility Cooperative
Plant ID58640
Plant NameKRS II Koloa Solar
Google MapMap
Bing MapMap
Plant StateHI
CountyKauai
SectorElectric Utility
Generator IDBESS7
Nameplate Capacity (MW)12
Net Summer Capacity (MW)12
Net Winter Capacity (MW)12
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month7
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude21.900833
Longitude-159.45
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:915

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:217

Sources EV-9c5a2851045a8afdd2f7fa5a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d08af8541a6b3875679785f67c3ccdc93cbc04f034ff6d1db3fc5cedd0722340

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:915

Sources EV-1deab0d2df9a61f1d9ec59e2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 37a417ef6de01ebb1d2aac96625483cdf6391c2fee5a0fe1083d10f7234cc98a

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel