POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

KRS I Anahola Solar Hybrid / BESS8

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-86cd754e2ffb6e9b8de30d71
Net Summer Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-86cd754e2ffb6e9b8de30d71
Net Winter Capacity (MW)12 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-86cd754e2ffb6e9b8de30d71
Detailed source fields
Original source fieldPublished value or condition
Entity ID10071
Entity NameKauai Island Utility Cooperative
Plant ID58639
Plant NameKRS I Anahola Solar Hybrid
Google MapMap
Bing MapMap
Plant StateHI
CountyKauai
SectorElectric Utility
Generator IDBESS8
Nameplate Capacity (MW)12
Net Summer Capacity (MW)12
Net Winter Capacity (MW)12
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month7
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude22.131667
Longitude-159.3031
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:914

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:216

Sources EV-79fcc5879cb15a701156e2e9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5c398f4e8a867c5b5a20524c970decee6b6b61ae5a67d0f796839146e7c5aab9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:914

Sources EV-86cd754e2ffb6e9b8de30d71
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1032c06bd61f40838de581e443460c4ce9b4dbdceaf536d720905592df5a3163

Usage terms US government public domain

Source snapshots by date · USA · eia860

KRS I Anahola Solar Hybrid / BESS8

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID10071
Utility NameKauai Island Utility Cooperative
Plant Code58639
Plant NameKRS I Anahola Solar Hybrid
StateHI
CountyKauai
Generator IDBESS8
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)12
Nameplate Power Factor1
Summer Capacity (MW)12
Winter Capacity (MW)12
StatusP
Effective Month12
Effective Year2025
Current Month7
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:216

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:216

Sources EV-79fcc5879cb15a701156e2e9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5c398f4e8a867c5b5a20524c970decee6b6b61ae5a67d0f796839146e7c5aab9

Usage terms US government public domain

Source snapshots by date · USA · eia860m

KRS I Anahola Solar Hybrid / BESS8

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID10071
Entity NameKauai Island Utility Cooperative
Plant ID58639
Plant NameKRS I Anahola Solar Hybrid
Google MapMap
Bing MapMap
Plant StateHI
CountyKauai
SectorElectric Utility
Generator IDBESS8
Nameplate Capacity (MW)12
Net Summer Capacity (MW)12
Net Winter Capacity (MW)12
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month7
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude22.131667
Longitude-159.3031
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:914

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:914

Sources EV-86cd754e2ffb6e9b8de30d71
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1032c06bd61f40838de581e443460c4ce9b4dbdceaf536d720905592df5a3163

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel