Australia · Generator · plant location

Beresfield BESS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Beresfield BESS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.93 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-cdfd8eb5d62207e3a5b407b3
Unit Capacity (MW AC)1.93 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-cdfd8eb5d62207e3a5b407b3
Aggregated Nameplate Capacity (MW DC)181.42 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-cdfd8eb5d62207e3a5b407b3
Aggregated Nameplate Capacity (MW AC)181.42 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-cdfd8eb5d62207e3a5b407b3
Agg Nameplate Storage Capacity (MWh)361.9 MWhOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-cdfd8eb5d62207e3a5b407b3
Detailed source fields
Original source fieldPublished value or condition
Survey ID2973
Site NameBeresfield BESS
Site Ownerfirmpower_NR
RegionNSW1
Max Site Capacity (AC)170
Gen Info Unit ID297301
Unit NameBB1
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count94
Unit Capacity (MW DC)1.93
Unit Capacity (MW AC)1.93
Aggregated Nameplate Capacity (MW DC)181.42
Aggregated Nameplate Capacity (MW AC)181.42
Agg Nameplate Storage Capacity (MWh)361.9
Commitment StatusAnticipated
Full Commercial Use Date2027-12-18T00:00:00
Expected Closure Year2048
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-25T09:53:32
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnticipated
source_record_idGenerator Information:102

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:102

Sources EV-cdfd8eb5d62207e3a5b407b3
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:45

Sources EV-8d0e8f7fa990ffaea48d23dd
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 54e6c09590ce3df58474c636e31aa832340ffc5b070b6e90d1c0ed9c8a18740a

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel