Beresfield BESS
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW DC) | 1.93 MWdc | Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 |
| Unit Capacity (MW AC) | 1.93 MWac | Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 |
| Aggregated Nameplate Capacity (MW DC) | 181.42 MWdc | Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 |
| Aggregated Nameplate Capacity (MW AC) | 181.42 MWac | Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 |
| Agg Nameplate Storage Capacity (MWh) | 361.9 MWh | Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 2973 |
| Site Name | Beresfield BESS |
| Site Owner | firmpower_NR |
| Region | NSW1 |
| Max Site Capacity (AC) | 170 |
| Gen Info Unit ID | 297301 |
| Unit Name | BB1 |
| Technology Type | Battery Storage |
| Technology Detail | Lithium-ion |
| Dispatch Type | Scheduled |
| Unit Count | 94 |
| Unit Capacity (MW DC) | 1.93 |
| Unit Capacity (MW AC) | 1.93 |
| Aggregated Nameplate Capacity (MW DC) | 181.42 |
| Aggregated Nameplate Capacity (MW AC) | 181.42 |
| Agg Nameplate Storage Capacity (MWh) | 361.9 |
| Commitment Status | Anticipated |
| Full Commercial Use Date | 2027-12-18T00:00:00 |
| Expected Closure Year | 2048 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-05-25T09:53:32 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Anticipated |
| source_record_id | Generator Information:102 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c
Usage terms AEMO general copyright permission subject to exceptions
Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:45
Sources EV-8d0e8f7fa990ffaea48d23ddEvidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 54e6c09590ce3df58474c636e31aa832340ffc5b070b6e90d1c0ed9c8a18740a
Usage terms AEMO general copyright permission subject to exceptions