POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Beresfield BESS Generator · Plan
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 1.93 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 Unit Capacity (MW AC) 1.93 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 Aggregated Nameplate Capacity (MW DC) 181.42 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 Aggregated Nameplate Capacity (MW AC) 181.42 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 Agg Nameplate Storage Capacity (MWh) 361.9 MWh Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3
Detailed source fields Original source field Published value or condition Survey ID 2973 Site Name Beresfield BESS Site Owner firmpower_NR Region NSW1 Max Site Capacity (AC) 170 Gen Info Unit ID 297301 Unit Name BB1 Technology Type Battery Storage Technology Detail Lithium-ion Dispatch Type Scheduled Unit Count 94 Unit Capacity (MW DC) 1.93 Unit Capacity (MW AC) 1.93 Aggregated Nameplate Capacity (MW DC) 181.42 Aggregated Nameplate Capacity (MW AC) 181.42 Agg Nameplate Storage Capacity (MWh) 361.9 Commitment Status Anticipated Full Commercial Use Date 2027-12-18T00:00:00 Expected Closure Year 2048 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-25T09:53:32 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:102
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:45
Sources EV-8d0e8f7fa990ffaea48d23dd Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 54e6c09590ce3df58474c636e31aa832340ffc5b070b6e90d1c0ed9c8a18740a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2973 Site Name Beresfield BESS Site Owner firmpower_NR Region NSW1 Max Site Capacity (AC) 170 Gen Info Unit ID 297301 Unit Name BB1 Technology Type Battery Storage Technology Detail Lithium-ion Dispatch Type Scheduled Unit Count 94 Unit Capacity (MW DC) 1.93 Unit Capacity (MW AC) 1.93 Aggregated Nameplate Capacity (MW DC) 181.42 Aggregated Nameplate Capacity (MW AC) 181.42 Agg Nameplate Storage Capacity (MWh) 361.9 Commitment Status Anticipated Full Commercial Use Date 2027-12-18T00:00:00 Expected Closure Year 2048 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-25T09:53:32 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:102
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region NSW1 AEMO Survey ID 2973 Gen Info Unit ID 297301 Site Name Beresfield BESS Commitment Status Anticipated Expected Closure Year 2048 Survey Latest Update Date 2026-05-25T09:53:32 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Expected Closure Year:45
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:45
Sources EV-8d0e8f7fa990ffaea48d23dd Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 54e6c09590ce3df58474c636e31aa832340ffc5b070b6e90d1c0ed9c8a18740a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 340 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 170 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cdfd8eb5d62207e3a5b407b3 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:102
Sources EV-cdfd8eb5d62207e3a5b407b3 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 48a322de2b6c3a35ca85f938b3702bfeaa07ae972463a6cc6688991ed7c9082c Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset