Australia · Generator · plant location

Brigalow GT (Kogan Creek GT)

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Brigalow GT (Kogan Creek GT)

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)33.3 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-3e45ad7754e8999cefd3d8ed
Aggregated Nameplate Capacity (MW AC)399.6 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-3e45ad7754e8999cefd3d8ed
Detailed source fields
Original source fieldPublished value or condition
Survey ID2568
Site NameBrigalow GT (Kogan Creek GT)
KCI IdQ00083
Site OwnerCSE H2 Pty Ltd
RegionQLD1
Max Site Capacity (AC)400
Gen Info Unit ID256801
Unit NameKCGT_GU1
Technology TypeGas Turbine
Technology DetailOCGT
Gas Turbine Fuel TypeNatural Gas
Dispatch TypeScheduled
Unit Count12
Unit Capacity (MW AC)33.3
Aggregated Nameplate Capacity (MW AC)399.6
Commitment StatusAnticipated
Full Commercial Use Date2028-12-31T00:00:00
Expected Closure Year2059
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-12T11:04:24
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnticipated
source_record_idGenerator Information:193

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:193

Sources EV-3e45ad7754e8999cefd3d8ed
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:85

Sources EV-a3f6697c28b4f05d3740333d
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 35b1e0b67b5a1b9f42e7418d4ed46e67009cc3d339fdcb8e3a472715a52281c4

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel