Brigalow GT (Kogan Creek GT)
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 33.3 MWac | 原出典の列定義 · 発電登録単位 · Anticipated 基準日 2026-07-31 根拠 EV-3e45ad7754e8999cefd3d8ed |
| Aggregated Nameplate Capacity (MW AC) | 399.6 MWac | 原出典の列定義 · 発電登録単位 · Anticipated 基準日 2026-07-31 根拠 EV-3e45ad7754e8999cefd3d8ed |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 2568 |
| Site Name | Brigalow GT (Kogan Creek GT) |
| KCI Id | Q00083 |
| Site Owner | CSE H2 Pty Ltd |
| Region | QLD1 |
| Max Site Capacity (AC) | 400 |
| Gen Info Unit ID | 256801 |
| Unit Name | KCGT_GU1 |
| Technology Type | Gas Turbine |
| Technology Detail | OCGT |
| Gas Turbine Fuel Type | Natural Gas |
| Dispatch Type | Scheduled |
| Unit Count | 12 |
| Unit Capacity (MW AC) | 33.3 |
| Aggregated Nameplate Capacity (MW AC) | 399.6 |
| Commitment Status | Anticipated |
| Full Commercial Use Date | 2028-12-31T00:00:00 |
| Expected Closure Year | 2059 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-05-12T11:04:24 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | Anticipated |
| source_record_id | Generator Information:193 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 2件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:193
根拠 EV-3e45ad7754e8999cefd3d8ed資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2
利用条件 AEMO general copyright permission subject to exceptions
資料の基準 2026-07-24 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Expected Closure Year:85
根拠 EV-a3f6697c28b4f05d3740333d資料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 35b1e0b67b5a1b9f42e7418d4ed46e67009cc3d339fdcb8e3a472715a52281c4
利用条件 AEMO general copyright permission subject to exceptions