POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Brigalow GT (Kogan Creek GT) Generator · Plan
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 33.3 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed Aggregated Nameplate Capacity (MW AC) 399.6 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed
Detailed source fields Original source field Published value or condition Survey ID 2568 Site Name Brigalow GT (Kogan Creek GT) KCI Id Q00083 Site Owner CSE H2 Pty Ltd Region QLD1 Max Site Capacity (AC) 400 Gen Info Unit ID 256801 Unit Name KCGT_GU1 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas Dispatch Type Scheduled Unit Count 12 Unit Capacity (MW AC) 33.3 Aggregated Nameplate Capacity (MW AC) 399.6 Commitment Status Anticipated Full Commercial Use Date 2028-12-31T00:00:00 Expected Closure Year 2059 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-12T11:04:24 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:193
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:85
Sources EV-a3f6697c28b4f05d3740333d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 35b1e0b67b5a1b9f42e7418d4ed46e67009cc3d339fdcb8e3a472715a52281c4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 2568 Gen Info Unit ID 256801 Site Name Brigalow GT (Kogan Creek GT) Commitment Status Anticipated Expected Closure Year 2059 Survey Latest Update Date 2026-05-12T11:04:24 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Expected Closure Year:85
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:85
Sources EV-a3f6697c28b4f05d3740333d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 35b1e0b67b5a1b9f42e7418d4ed46e67009cc3d339fdcb8e3a472715a52281c4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2568 Site Name Brigalow GT (Kogan Creek GT) KCI Id Q00083 Site Owner CSE H2 Pty Ltd Region QLD1 Max Site Capacity (AC) 400 Gen Info Unit ID 256801 Unit Name KCGT_GU1 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas Dispatch Type Scheduled Unit Count 12 Unit Capacity (MW AC) 33.3 Aggregated Nameplate Capacity (MW AC) 399.6 Commitment Status Anticipated Full Commercial Use Date 2028-12-31T00:00:00 Expected Closure Year 2059 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-12T11:04:24 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:193
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-3e45ad7754e8999cefd3d8ed 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:193
Sources EV-3e45ad7754e8999cefd3d8ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 83d469d8a8100f506a825509452f1b795a04ece5639e3d0bfafe396e1ac8ffd2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset