Australia · Generator · plant location

Gladstone

공식 원천의 전력 객체 · withdrawal announced

Project stage · source basis
Stage requires verification · withdrawal_announced
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Gladstone

Generator · withdrawal announced

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-e7ab394a39e98144ae19c5ed
Aggregated Nameplate Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-e7ab394a39e98144ae19c5ed
Detailed source fields
Original source fieldPublished value or condition
Survey ID1077
Site NameGladstone
Site OwnerGladstone Power Station Participants
RegionQLD1
Max Site Capacity (AC)1680
Gen Info Unit ID107703
Unit NameGladstone:3
Technology TypeCoal
Technology DetailBlack Coal
DUIDGSTONE3
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)280
Aggregated Nameplate Capacity (MW AC)280
Commitment StatusAnnounced Withdrawal
Expected Closure Year2029
Closure Date2029-03-31T00:00:00
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-06T15:01:43
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnnounced Withdrawal
source_record_idGenerator Information:542

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:542

Sources EV-e7ab394a39e98144ae19c5ed
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 8815942a1f362ada536d9f31157f10d825f391e72e62701d5c3d90b83417c19f

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:249

Sources EV-efc600665cb52553a1f8714c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 6797bc88113cd3372e9e2fcf061a3cd4bddb4986f9c1a77a7281e3dec3994404

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel