Gladstone
発電機 · withdrawal announced
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 280 MWac | 原出典の列定義 · 発電登録単位 · Announced Withdrawal 基準日 2026-07-31 根拠 EV-e7ab394a39e98144ae19c5ed |
| Aggregated Nameplate Capacity (MW AC) | 280 MWac | 原出典の列定義 · 発電登録単位 · Announced Withdrawal 基準日 2026-07-31 根拠 EV-e7ab394a39e98144ae19c5ed |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 1077 |
| Site Name | Gladstone |
| Site Owner | Gladstone Power Station Participants |
| Region | QLD1 |
| Max Site Capacity (AC) | 1680 |
| Gen Info Unit ID | 107703 |
| Unit Name | Gladstone:3 |
| Technology Type | Coal |
| Technology Detail | Black Coal |
| DUID | GSTONE3 |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 280 |
| Aggregated Nameplate Capacity (MW AC) | 280 |
| Commitment Status | Announced Withdrawal |
| Expected Closure Year | 2029 |
| Closure Date | 2029-03-31T00:00:00 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-05-06T15:01:43 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | Announced Withdrawal |
| source_record_id | Generator Information:542 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 2件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:542
根拠 EV-e7ab394a39e98144ae19c5ed資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 8815942a1f362ada536d9f31157f10d825f391e72e62701d5c3d90b83417c19f
利用条件 AEMO general copyright permission subject to exceptions
資料の基準 2026-07-24 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Expected Closure Year:249
根拠 EV-efc600665cb52553a1f8714c資料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 6797bc88113cd3372e9e2fcf061a3cd4bddb4986f9c1a77a7281e3dec3994404
利用条件 AEMO general copyright permission subject to exceptions