Gladstone
발전기 · withdrawal announced
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Unit Capacity (MW AC) | 280 MWac | 원출처 열 정의 · 발전등록 단위 · Announced Withdrawal 기준일 2026-07-31 근거 EV-e7ab394a39e98144ae19c5ed |
| Aggregated Nameplate Capacity (MW AC) | 280 MWac | 원출처 열 정의 · 발전등록 단위 · Announced Withdrawal 기준일 2026-07-31 근거 EV-e7ab394a39e98144ae19c5ed |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Survey ID | 1077 |
| Site Name | Gladstone |
| Site Owner | Gladstone Power Station Participants |
| Region | QLD1 |
| Max Site Capacity (AC) | 1680 |
| Gen Info Unit ID | 107703 |
| Unit Name | Gladstone:3 |
| Technology Type | Coal |
| Technology Detail | Black Coal |
| DUID | GSTONE3 |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 280 |
| Aggregated Nameplate Capacity (MW AC) | 280 |
| Commitment Status | Announced Withdrawal |
| Expected Closure Year | 2029 |
| Closure Date | 2029-03-31T00:00:00 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-05-06T15:01:43 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 원문 상태 | Announced Withdrawal |
| source_record_id | Generator Information:542 |
위치: 좌표 미확보 · 지도 표시 없음
원문·기준일·확인일 2건
자료 기준 2026-07-31 · 수집 확인 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
원문 위치 Generator Information:542
근거 EV-e7ab394a39e98144ae19c5ed자료 SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 8815942a1f362ada536d9f31157f10d825f391e72e62701d5c3d90b83417c19f
이용조건 AEMO general copyright permission subject to exceptions
자료 기준 2026-07-24 · 수집 확인 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
원문 위치 Expected Closure Year:249
근거 EV-efc600665cb52553a1f8714c자료 SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 6797bc88113cd3372e9e2fcf061a3cd4bddb4986f9c1a77a7281e3dec3994404
이용조건 AEMO general copyright permission subject to exceptions
