DESIGN & EQUIPMENT EVIDENCE DESK
AI Data Center Technology and Equipment
Design and Equipment Guide
Explore the key roles of power, cooling, and communications infrastructure, as well as the equipment required for data centers.POWER CONNECTION GUIDE
Verify the supply basis before verifying the power equipment.
- Separate the target IT load and PUE from the facility’s applied capacity.
- KEPCO does not treat applications for electricity use, supply agreements, and grid connection as part of the same document as the desired start date.
- View data center power connection procedures and required documents →
PRIMARY-SOURCE CATALOG
Design and Equipment by Category
These are the core facilities that make up a data center and their applications.OPR · BOD · Standard Matrix
Integrate target IT load, growth stage, SLA, maintainability, budget, and permitting conditions into a single reference document
- Target IT MW
- Phased Expansion
- Availability and Redundancy
- PUE and WUE Targets
- AHJ·Regulations
Based on AI accelerator racks
Store data separately by GPU generation, power per rack, and liquid/air cooling allocation and deployment units.
- Manufacturer·Model
- Number of accelerators
- Operating/Peak kW
- Rack U·Weight
- Cooling Topology
Power Supply · Voltage transformation · Power Distribution
Separate capacity figures and their basis—from the KEPCO service point through MV/LV transformers, protection coordination, and cable and busway routes.
- Supply Voltage
- Contracts and Supply Commitments
- Transformer MVA
- Cooperation in Protection
- N/N+1/2N
UPS · Batteries · Emergency Power Generators
Equipment ledger for calculating firm capacity and autonomy time for normal, emergency, and maintenance scenarios
- Rated kVA/kW
- Efficiency Curve
- Battery Type
- Free time
- Generator Fuel Duration
EPOD · Busway · RPP
Link the physical power path to the rack with circuit breakers, tap-offs, and redundancy paths to the deployment data
- Busbar Rating
- Paragraph content
- Tap-off
- Path A/B
- Expansion capacity
DLC · CDU · Secondary Cooling Loop
Calculate the number of CDUs, inlet temperature, flow rate, supply and return temperatures, and heat exchange paths based on rack thermal load.
- Liquid Heat Distribution Ratio
- CDU MW
- Flow Rate·ΔT
- TCS Temperature
- N+1
Chillers · CRAH · Air-cooled residual load
Configure PUE/WUE inputs to reflect climate, humidity, water quality, and the residual air load after liquid cooling
- Design outdoor air
- Refrigeration Tons·MW
- CRAH Airflow
- Free cooling
- Water Usage Strategy
MMR · Optical Path · Fabric
Record the dualization of communication connections, MMR separation, and test items for rack fabric, latency, loss, and fault recovery.
- Telecom Provider Routes
- MMR A/B
- Gwangsim Line
- Fabric
- Latency and Recovery Time
Fire · Evacuation · Disaster Prevention
Link domestic fire and building permits, as well as reviews of detection, fire suppression, and fire compartmentation by equipment room, to the design RFI.
- Load Shedding Method
- Fire suppression systems
- Fire Compartment
- Evacuation
- Jurisdictional Consultation
Calculation · Verification · Commissioning
Manage calculated values, external analyses, field test results, and operational handover evidence according to the same revision and digest standards.
- PASS/NG/PENDING/STALE
- RFI
- Power Flow
- CFD
- IST·Handover
MANUFACTURER SOURCE REGISTER
Manufacturers and Product Lines
52We have registered the product line. We do not estimate values for which no public figures are available, and domestic supply, delivery times, and maintenance are treated as separate verification items.DGX GB200 / GB300 NVL72
Candidates based on rack-scale AI computing and direct liquid cooling criteria
DGX H100 / H200
Comparison Criteria for Hopper-Generation Racks and Server Configurations
Integrated Rack Scalable Systems
AI Factory: Integrated Candidate for Racks, Servers, and Networks
Private Cloud AI / Cray XD
Candidate Enterprise AI and HPC Systems
Liquid-Cooled AI SuperCluster
Candidates for integration of high-density GPU racks and liquid cooling
Galaxy VXL / VX
Comparison of High-Capacity Modular UPS Systems: Efficiency and Redundancy
Liebert EXL S1 / Trinergy
Comparison of High-Capacity UPS Systems and Dynamic Operating Modes
93PM / 9395XC
Modular UPS, Battery, and Power Quality Candidates
Ultra-high-voltage transformers, switchgear, and DC power solutions
Candidate Sites for Domestic Power Reception, Transformation, and Distribution Networks
Power Transformers, GIS, and Power Distribution Equipment
Candidates for 154 kV-class power reception facilities and substation packages
Power Transformers, GIS, STATCOM
Candidate Sites for Extra-High-Voltage Substations and Power Quality Facilities
EcoStruxure Power / Busway
Integrated Candidate for Power Distribution, Monitoring, and Busway
Data Center Generator Sets
Emergency Generators, Parallel Operation, and Fuel Planning Candidates
Data Center Power Systems
Generators, Parallel Control, and Microgrid Candidates
Liebert XDU / DCD
CDU, Rear Door, and High-Density Thermal Management Candidates
CyberCool / CyberAir
Chillers, Precision Air Conditioning, and Data Hall Cooling Options
YORK Chillers
Candidate Sites for Large-Scale Chiller Plants and Heat Source Facilities
AquaForce Chillers
Candidate Sites for Air-Cooled and Water-Cooled Chiller Plants
CHx / AHx CDU
Candidates for Rack Direct Liquid Cooling (CDU and Manifold)
Coolant Distribution Units
Candidates for High-Density AI Rack Secondary-Loop CDUs
Spectrum-X / Quantum InfiniBand
AI Fabric and Scale-Out Network Candidates
Nexus Data Center Switching
Data Center Fabric, Management, and Security Candidates
VX IT / RiMatrix
Integrated Candidate for Racks, Enclosures, Power Distribution, and Cooling
EcoStruxure IT
Candidates for asset, power, and environmental monitoring and operational handover
MegaFlex DPA / HiPerGuard MV UPS
Candidate Configurations for Low- and Medium-Voltage UPS Systems in Large Data Centers
Keor XPE / UPSaver
Candidates for modular and high-capacity UPS and STS configurations
Track Busway T3 / T5
Data Hall Overhead Power Distribution and Tap-Off Candidates
SIVACON 8PS
Candidate busbar distribution routes from substations and UPS systems to data halls
Power Xpert Busway
Integrated Candidate for High-Current Power Distribution and Monitoring
UniGear / MNS / UniPack-S
Candidate configurations for medium- and low-voltage switchgear and compact substations
SIMOSEC / SIVACON
Integrated Candidate for Medium-Voltage Switchgear and Low-Voltage Distribution Panels
Lithium-ion battery system for UPS
Candidate Configurations for UPS Backup, Racks, and BMS
ESS Battery Solutions
Candidate batteries for UPS and ESS integration
DataSafe / PowerSafe
Candidate Lead-Acid and Lithium UPS Backup Batteries
Flex'ion Lithium-ion UPS Battery
Candidates for large-scale UPS lithium-ion backup systems
Magnitude / Pathfinder Chillers
Candidate Water-Cooled and Air-Cooled Chillers for Large Data Centers
CenTraVac / Sintesis
Candidates for Central Chillers and Heat Source Plants
Motivair Liquid Cooling Portfolio
Integrated CDU, Cold Plate, and Heat Exchanger Candidates
SmartPod / MicroPod
Candidate Sites for Single-Phase Immersion Cooling and Heat Recovery Systems
DataTank / CDU
Candidate Sites for Immersion and Direct Liquid Cooling Infrastructure
Sinorix Silent Extinguishing
Candidates for Low-Noise Gas-Based Fire Suppression Systems in Data Centers and Server Rooms
VesDA / Fire Suppression Solutions
Candidates for integrated smoke detection, fire control, and fire suppression systems
VESDA Air Sampling Detection
Candidates for Early Smoke Detection and Zone-Based Alarm Design
Desigo CC
Candidates for integrated monitoring of power, cooling, environmental, fire, and security systems
Metasys
Candidates for Integrated Monitoring of Mechanical, Electrical, and Environmental Systems
Trellis / Environet Alert
Asset, Power, and Environmental Monitoring and Capacity Management Candidates
PX Intelligent Rack PDU
Candidates for rack power measurement, remote control, and environmental sensors
Geist Rack PDU
Candidates for integrated rack-level metering, branching, and sensors
Video Systems / Access Management
Integrated Candidate for Perimeter, Access, and Video Security
Security Center
Integrated Candidate System for Access Control, Video Surveillance, Intrusion Detection, and Operational Incidents
SYSTIMAX Data Center
Candidates for structured cabling, fiber-optic cables, and high-density panels
EDGE / RocketRibbon
Candidates for high-density fiber-optic cabling, backbone, and MMR connections
We have aggregated products from the same product family as in the previous report by sector. This is not a ranking by sales volume, market share, or performance.
How to Read the Data and Checklist
Search for Practical Columns · Electricity Application Series → · Overall Flowchart
- Is it okay to shut down a server just because its CPU usage is low?
- Values to record when comparing server power profiles
- What’s the difference between a 40 MW data center and a 32 MW IT load?
- Data Center PC Construction Methods and Schedule: How to Distinguish Between Planning and Completion
- Understanding Data Center WUE: Compare Water Usage and Measurement Scopes Together
- When the air in front of and behind the servers mixes: hot aisles, cold aisles, and empty rack space
- Does “free cooling” mean it doesn’t use electricity? Guidelines for interpreting outdoor air cooling
- UPS Efficiency Table: Read by load range, not by a single rated value
- Reason for including the load factor along with capacity in the UPS redundancy comparison table