First Johor data center on Sedenak campus
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| critical_it_design_capacity | 98 MW | critical it design capacity · Building · as published As-of date 2025-06-05 Sources EV-4f6cb6a080509c815b6d3eb8 |
| critical_it_capacity_handed_over | 25 MW | critical it capacity handed over · first building phase · handover announced As-of date 2025-06-05 Sources EV-4f6cb6a080509c815b6d3eb8 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| collection_field_gaps |
|
| source_record_id | r1:power_source:f48336af28d2:power_asset:596c2a22d8bf |
Parent facility or plant record
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2025-06-05 · Retrieved 2026-10-05
www.yondrgroup.com
Source location inherited observation P012
Sources EV-ace2f53240f748559940d4d9Evidence SHA-256 5e75c10b2e1810d890d7d88308a6a2118f25c09c34df22579be040003f828c8c · raw_http_response
Data Source 2025-06-05 · Retrieved 2026-10-05
www.yondrgroup.com
Source location article body
Sources EV-4f6cb6a080509c815b6d3eb8Evidence SHA-256 5e75c10b2e1810d890d7d88308a6a2118f25c09c34df22579be040003f828c8c · raw_http_response