GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

ItemFirst Johor data center on Sedenak campus
CountryMalaysia
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · Published statement
Data Reference Date2025-06-05
Collection review date2026-10-05
critical it design capacityMW · critical it design capacity · Building · as published

98 MW
2025-06-05
Evidence for this value

critical it capacity handed overMW · critical it capacity handed over · first building phase · handover announced

25 MW
2025-06-05
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel