GDS Nusajaya Tech Park campus
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| utility_supply_maximum_demand | 85.5 MW | utility supply maximum demand · Campus · as published As-of date 2023-03-26 Sources EV-ba96e3c79bdd637a55c71a8a |
| interim_electricity_supply_capacity | 16 MW | interim electricity supply capacity · campus phase · planned interim supply As-of date 2023-03-26 Sources EV-ba96e3c79bdd637a55c71a8a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| collection_field_gaps |
|
| source_record_id | r1:power_source:5eaaad6f96a4:power_asset:f9662d22f231 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2023-03-26 · Retrieved 2026-10-05
www.tnb.com.my
Source location inherited observation P003
Sources EV-b4cdc84b8193c832826c2a0fEvidence SHA-256 384d3ae2dd4a1cb0acb967da689b4f373f330214ad515f7c08b7be43b715f3af · raw_http_response
Data Source 2023-03-26 · Retrieved 2026-10-05
www.tnb.com.my
Source location article body
Sources EV-ba96e3c79bdd637a55c71a8aEvidence SHA-256 384d3ae2dd4a1cb0acb967da689b4f373f330214ad515f7c08b7be43b715f3af · raw_http_response