Tunisia · Generation facilities

SoleCrypt Tozeur solar PV

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · TUN · primary:c335be1db4d424cf78a89adc

SoleCrypt Tozeur solar PV

Generation facilities · Plan

Metric or conditionSource valueBasis, scope and stage
solar_pv_capacity60 MWsolar pv capacity · generation project · developer claimed approved
As-of date Not stated
Sources EV-f09b49179a9e6779b5e1b843
Detailed source fields
Original source fieldPublished value or condition
source_record_idsolecrypt-tozeur

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
www.solecrypt.com ↗

Data Source Not stated · Retrieved 2026-10-05

www.solecrypt.com

Source location article body

Sources EV-f09b49179a9e6779b5e1b843
Evidence SHA-256 a6876a61ec9333fe10a7e8f4f42f41baeca04a3d990c79ddbe882ed6e0f9d6bc · raw_http_response

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel