United States of America · Announced development projects

Nebius Independence Missouri campus

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · primary:01fe7e21815b4c396adb5358

Nebius Independence Missouri campus

data center project · Plan

Metric or conditionSource valueBasis, scope and stage
planned_facility_capacity_unspecified1200 MWpublisher total plan · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
planned_utility_power800 MWIndependence Power and Light proposal · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
planned_onsite_generation400 MWonsite generation plan · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
Detailed source fields
Original source fieldPublished value or condition
source_record_idnebius-independence

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
nebius.com ↗

Data Source Not stated · Retrieved 2026-10-05

nebius.com

Source location article body

Sources EV-b5e91a41c616301ba4631257
Evidence SHA-256 03d3058b108279389f683dadb67a4fea4b6d02babd1ad75e0cb37278ca1305a8 · raw_http_response

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel