POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 4items · current page 1–4 · Source records, not unique facilities.

Power assets and projects · USA · primary:01fe7e21815b4c396adb5358

Nebius Independence Missouri campus

data center project · Plan

Metric or conditionSource valueBasis, scope and stage
planned_facility_capacity_unspecified1200 MWpublisher total plan · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
planned_utility_power800 MWIndependence Power and Light proposal · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
planned_onsite_generation400 MWonsite generation plan · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
Detailed source fields
Original source fieldPublished value or condition
source_record_idnebius-independence

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
nebius.com ↗

Data Source Not stated · Retrieved 2026-10-05

nebius.com

Source location article body

Sources EV-b5e91a41c616301ba4631257
Evidence SHA-256 03d3058b108279389f683dadb67a4fea4b6d02babd1ad75e0cb37278ca1305a8 · raw_http_response
Power observations · USA · primary:01fe7e21815b4c396adb5358

Nebius Independence Missouri campus

Campus · Official statement

Metric or conditionSource valueBasis, scope and stage
planned_facility_capacity_unspecified1200 MWpublisher total plan · Campus · Plan
As-of date Not stated
Sources EV-b5e91a41c616301ba4631257
Detailed source fields
Original source fieldPublished value or condition
Verification statusprimary_statement
Change typenew
Contracting parties

    Publisher plan; signed utility contract, plant permit and actual energization not established.

    Sources, reference dates and retrieval dates 1items
    nebius.com ↗

    Data Source Not stated · Retrieved 2026-10-05

    nebius.com

    Source location article body

    Sources EV-b5e91a41c616301ba4631257
    Evidence SHA-256 03d3058b108279389f683dadb67a4fea4b6d02babd1ad75e0cb37278ca1305a8 · raw_http_response
    Power observations · USA · primary:01fe7e21815b4c396adb5358

    Nebius Independence Missouri campus

    Campus · Official statement

    Metric or conditionSource valueBasis, scope and stage
    planned_onsite_generation400 MWonsite generation plan · Campus · Plan
    As-of date Not stated
    Sources EV-b5e91a41c616301ba4631257
    Detailed source fields
    Original source fieldPublished value or condition
    Verification statusprimary_statement
    Change typenew
    Contracting parties

      Publisher plan; signed utility contract, plant permit and actual energization not established.

      Sources, reference dates and retrieval dates 1items
      nebius.com ↗

      Data Source Not stated · Retrieved 2026-10-05

      nebius.com

      Source location article body

      Sources EV-b5e91a41c616301ba4631257
      Evidence SHA-256 03d3058b108279389f683dadb67a4fea4b6d02babd1ad75e0cb37278ca1305a8 · raw_http_response
      Power observations · USA · primary:01fe7e21815b4c396adb5358

      Nebius Independence Missouri campus

      Campus · Official statement

      Metric or conditionSource valueBasis, scope and stage
      planned_utility_power800 MWIndependence Power and Light proposal · Campus · Plan
      As-of date Not stated
      Sources EV-b5e91a41c616301ba4631257
      Detailed source fields
      Original source fieldPublished value or condition
      Verification statusprimary_statement
      Change typenew
      Contracting parties

        Publisher plan; signed utility contract, plant permit and actual energization not established.

        Sources, reference dates and retrieval dates 1items
        nebius.com ↗

        Data Source Not stated · Retrieved 2026-10-05

        nebius.com

        Source location article body

        Sources EV-b5e91a41c616301ba4631257
        Evidence SHA-256 03d3058b108279389f683dadb67a4fea4b6d02babd1ad75e0cb37278ca1305a8 · raw_http_response

        AI-DC KOREA MEMBER

        Log In

        Sign in to continue on this page.

        G Continue with GoogleK Continue with Kakao

        Choose the Google or Kakao account you registered with.

        Start a consultation · Choose a channel