United Kingdom · Announced development projects

Civo Hertfordshire edge data center

공식 원천의 전력 객체 · Under construction

Project stage · source basis
Under construction · under_construction
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09-22
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · primary:ad2c74e278c591375c6a87f6

Civo Hertfordshire edge data center

data center project · Under construction

Metric or conditionSource valueBasis, scope and stage
planned_capacity_unspecified8 MWplanned capacity unspecified · initial phase · Plan
As-of date 2026-09-22
Sources EV-b6cec2ec26940579656c6539
planned_capacity_unspecified38 MWplanned capacity unspecified · same plot expansion · Plan
As-of date 2026-09-22
Sources EV-b6cec2ec26940579656c6539
cooling_technologyliquid cooling technologycooling technology · site · Design
As-of date 2026-09-22
Sources EV-b6cec2ec26940579656c6539
Detailed source fields
Original source fieldPublished value or condition
source_record_idcivo-hertfordshire

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
www.civo.com ↗

Data Source 2026-09-22 · Retrieved 2026-10-05

www.civo.com

Source location article body

Sources EV-b6cec2ec26940579656c6539
Evidence SHA-256 ec297dc2d09eeef70563446f21eceacc68612e500c5b18f7ce3c72c73cd0f574 · raw_http_response

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel