| Item | Civo Hertfordshire edge data center |
|---|---|
| Country | United Kingdom |
| Data Type | Announced development projects |
| Reported operator | Check each original source |
| Review status | 공식 원천의 전력 객체 · Under construction |
| Data Reference Date | 2026-09-22 |
| Collection review date | 2026-10-05 |
| planned capacity unspecifiedMW · planned capacity unspecified · initial phase · Plan | 8 MW |
| planned capacity unspecifiedMW · planned capacity unspecified · same plot expansion · Plan | 38 MW |
| cooling technologytechnology · cooling technology · site · Design | liquid cooling technology |
Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.