Arresgill Wind Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1b53665bc614471b3e50420 |
| MW Increase / Decrease | 150 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1b53665bc614471b3e50420 |
| Cumulative Total Capacity (MW) | 150 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e1b53665bc614471b3e50420 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Arresgill Wind Farm |
| Customer Name | ARRESGILL ENERGY LIMITED |
| Connection Site | Arresgill 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 150.00 |
| Cumulative Total Capacity (MW) | 150.00 |
| MW Effective From | 2031-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005ikZQAQ |
| Project Number | PRO-002409 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:82 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:82
Sources EV-e1b53665bc614471b3e50420Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 5a7e608ef3d7bb018e857ab8ed6aae00045bb4a45eb57b68385bab8d8375cac6
Usage terms NESO Open Data Licence
