United Kingdom · Grid connection register

Bilbo Farm

공식 원천의 전력 객체 · under construction or commissioning

Project stage · source basis
Stage requires verification · under_construction_or_commissioning
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Bilbo Farm

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
MW Increase / Decrease25 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
Cumulative Total Capacity (MW)25 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
Detailed source fields
Original source fieldPublished value or condition
Project NameBilbo Farm
Customer NameLEL BILBO SOLAR LIMITED
Connection SiteStrichen 132/33kV GSP Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease25.00
Cumulative Total Capacity (MW)25.00
MW Effective From2024-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iXhQAI
Project NumberPRO-001301-1
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:196

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:196

Sources EV-c789dc3ee259e6443ee86b43
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3394325b6b287369318b5db2d0cc8f7d7d2471a79e0e2554c4861bc268e57a0b

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel