POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bilbo Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:0612f716f5e1eb7586ae122d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3cb0d4665f1f5326a72f07a2
to_kindpower_object
to_idneso:connection_site:0612f716f5e1eb7586ae122d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:196

Sources EV-c789dc3ee259e6443ee86b43
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3394325b6b287369318b5db2d0cc8f7d7d2471a79e0e2554c4861bc268e57a0b

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bilbo Farm

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
MW Increase / Decrease25 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
Cumulative Total Capacity (MW)25 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-c789dc3ee259e6443ee86b43
Detailed source fields
Original source fieldPublished value or condition
Project NameBilbo Farm
Customer NameLEL BILBO SOLAR LIMITED
Connection SiteStrichen 132/33kV GSP Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease25.00
Cumulative Total Capacity (MW)25.00
MW Effective From2024-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iXhQAI
Project NumberPRO-001301-1
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:196

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:196

Sources EV-c789dc3ee259e6443ee86b43
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3394325b6b287369318b5db2d0cc8f7d7d2471a79e0e2554c4861bc268e57a0b

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bilbo Farm

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBilbo Farm
Customer NameLEL BILBO SOLAR LIMITED
Connection SiteStrichen 132/33kV GSP Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease25.00
Cumulative Total Capacity (MW)25.00
MW Effective From2024-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iXhQAI
Project NumberPRO-001301-1
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:196

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:196

Sources EV-c789dc3ee259e6443ee86b43
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3394325b6b287369318b5db2d0cc8f7d7d2471a79e0e2554c4861bc268e57a0b

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel