Bellbroughton Energy Park
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-72d834c60987a91423a51195 |
| MW Increase / Decrease | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-72d834c60987a91423a51195 |
| Cumulative Total Capacity (MW) | 500 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-72d834c60987a91423a51195 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bellbroughton Energy Park |
| Customer Name | ELGIN ENERGY ES CO LIMITED |
| Connection Site | Warwickshire Connection Node A 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 500.00 |
| Cumulative Total Capacity (MW) | 500.00 |
| MW Effective From | 2037-10-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e0000010wloAAA |
| Project Number | PRO-002826 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:154 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:154
Sources EV-72d834c60987a91423a51195Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 de1949910ff21a982650a9c67d4572bb8e5b691ce5ad8a14f039d41606838f9c
Usage terms NESO Open Data Licence