POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bellbroughton Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:ab3f42132ac0192689a2953b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:09e3ae39a6ed399d1e76c3c2
to_kindpower_object
to_idneso:connection_site:ab3f42132ac0192689a2953b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:154

Sources EV-72d834c60987a91423a51195
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 de1949910ff21a982650a9c67d4572bb8e5b691ce5ad8a14f039d41606838f9c

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bellbroughton Energy Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-72d834c60987a91423a51195
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-72d834c60987a91423a51195
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-72d834c60987a91423a51195
Detailed source fields
Original source fieldPublished value or condition
Project NameBellbroughton Energy Park
Customer NameELGIN ENERGY ES CO LIMITED
Connection SiteWarwickshire Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2037-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wloAAA
Project NumberPRO-002826
GateNot obtained
Original textScoping
source_record_idcsv:row:154

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:154

Sources EV-72d834c60987a91423a51195
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 de1949910ff21a982650a9c67d4572bb8e5b691ce5ad8a14f039d41606838f9c

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bellbroughton Energy Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBellbroughton Energy Park
Customer NameELGIN ENERGY ES CO LIMITED
Connection SiteWarwickshire Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2037-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wloAAA
Project NumberPRO-002826
GateNot obtained
Original textScoping
source_record_idcsv:row:154

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:154

Sources EV-72d834c60987a91423a51195
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 de1949910ff21a982650a9c67d4572bb8e5b691ce5ad8a14f039d41606838f9c

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel