Craigo Glenskinno
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-32a968531726dcc9c516a357 |
| MW Increase / Decrease | 60 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-32a968531726dcc9c516a357 |
| Cumulative Total Capacity (MW) | 60 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-32a968531726dcc9c516a357 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Craigo Glenskinno |
| Customer Name | BSR APPLICATIONS LIMITED |
| Connection Site | Bridge of Dun 2 132/33kV Grid Supply Point Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 60.00 |
| Cumulative Total Capacity (MW) | 60.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore |
| Project ID | a0l8e0000012kl5AAA |
| Project Number | PRO-004771 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:155 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:155
Sources EV-32a968531726dcc9c516a357Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7ba4b0de9aa71f86f962259d729160d7f4b6f0b18c134b7c9bffd060b2bda7e8
Usage terms NESO Open Data Licence