POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Craigo Glenskinno

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:22a5c431e9e2ce7d8e77ac5b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:cc6d3758a11aadd71f99fefe
to_kindpower_object
to_idneso:connection_site:22a5c431e9e2ce7d8e77ac5b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:155

Sources EV-32a968531726dcc9c516a357
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7ba4b0de9aa71f86f962259d729160d7f4b6f0b18c134b7c9bffd060b2bda7e8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Craigo Glenskinno

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-32a968531726dcc9c516a357
MW Increase / Decrease60 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-32a968531726dcc9c516a357
Cumulative Total Capacity (MW)60 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-32a968531726dcc9c516a357
Detailed source fields
Original source fieldPublished value or condition
Project NameCraigo Glenskinno
Customer NameBSR APPLICATIONS LIMITED
Connection SiteBridge of Dun 2 132/33kV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease60.00
Cumulative Total Capacity (MW)60.00
MW Effective From2033-10-31
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012kl5AAA
Project NumberPRO-004771
GateNot obtained
Original textScoping
source_record_idcsv:row:155

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:155

Sources EV-32a968531726dcc9c516a357
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7ba4b0de9aa71f86f962259d729160d7f4b6f0b18c134b7c9bffd060b2bda7e8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Craigo Glenskinno

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCraigo Glenskinno
Customer NameBSR APPLICATIONS LIMITED
Connection SiteBridge of Dun 2 132/33kV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease60.00
Cumulative Total Capacity (MW)60.00
MW Effective From2033-10-31
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012kl5AAA
Project NumberPRO-004771
GateNot obtained
Original textScoping
source_record_idcsv:row:155

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:155

Sources EV-32a968531726dcc9c516a357
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7ba4b0de9aa71f86f962259d729160d7f4b6f0b18c134b7c9bffd060b2bda7e8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel