Craigo Glenskinno
接入登记 · scoping
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-32a968531726dcc9c516a357 |
| MW Increase / Decrease | 60 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-32a968531726dcc9c516a357 |
| Cumulative Total Capacity (MW) | 60 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-32a968531726dcc9c516a357 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Craigo Glenskinno |
| Customer Name | BSR APPLICATIONS LIMITED |
| Connection Site | Bridge of Dun 2 132/33kV Grid Supply Point Substation |
| Stage | 未获取 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 60.00 |
| Cumulative Total Capacity (MW) | 60.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore |
| Project ID | a0l8e0000012kl5AAA |
| Project Number | PRO-004771 |
| Gate | 未获取 |
| 原文状态 | Scoping |
| source_record_id | csv:row:155 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:155
依据 EV-32a968531726dcc9c516a357资料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7ba4b0de9aa71f86f962259d729160d7f4b6f0b18c134b7c9bffd060b2bda7e8
