Easter Drumclair Generator
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-ba303d50d58d9a163dc3ee52 |
| MW Increase / Decrease | 6 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-ba303d50d58d9a163dc3ee52 |
| Cumulative Total Capacity (MW) | 6 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-ba303d50d58d9a163dc3ee52 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Easter Drumclair Generator |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | Bathgate 132/33kV |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 6.00 |
| Cumulative Total Capacity (MW) | 6.00 |
| MW Effective From | 2022-11-30 |
| Project Status | Awaiting Consents |
| HOST TO | SPT |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005ii3QAA |
| Project Number | PRO-000809 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:200 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:200
Sources EV-ba303d50d58d9a163dc3ee52Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b068ba12cf58735b755abf6a3d29449e6e3c480bde58da4a0d4c2f882fd21c19
Usage terms NESO Open Data Licence