POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Easter Drumclair Generator

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4a455cfeb0fd8ef6c61be268 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:b5c4322f868a528aa167835c
to_kindpower_object
to_idneso:connection_site:4a455cfeb0fd8ef6c61be268
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:200

Sources EV-ba303d50d58d9a163dc3ee52
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b068ba12cf58735b755abf6a3d29449e6e3c480bde58da4a0d4c2f882fd21c19

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Easter Drumclair Generator

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-ba303d50d58d9a163dc3ee52
MW Increase / Decrease6 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-ba303d50d58d9a163dc3ee52
Cumulative Total Capacity (MW)6 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-ba303d50d58d9a163dc3ee52
Detailed source fields
Original source fieldPublished value or condition
Project NameEaster Drumclair Generator
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease6.00
Cumulative Total Capacity (MW)6.00
MW Effective From2022-11-30
Project StatusAwaiting Consents
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005ii3QAA
Project NumberPRO-000809
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:200

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:200

Sources EV-ba303d50d58d9a163dc3ee52
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b068ba12cf58735b755abf6a3d29449e6e3c480bde58da4a0d4c2f882fd21c19

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Easter Drumclair Generator

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameEaster Drumclair Generator
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease6.00
Cumulative Total Capacity (MW)6.00
MW Effective From2022-11-30
Project StatusAwaiting Consents
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005ii3QAA
Project NumberPRO-000809
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:200

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:200

Sources EV-ba303d50d58d9a163dc3ee52
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b068ba12cf58735b755abf6a3d29449e6e3c480bde58da4a0d4c2f882fd21c19

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel