South Korea · Power project

154kV 기장-장안(좌천)T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 기장-장안(좌천)T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-f4878318a2904c145b79ef19
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fd4dc70374ca416a
stable_project_keyprjtDef:232452:ESB
project_definition232452
first_region_codeESB
manual_source_formatfalse
project_name154kV 기장-장안(좌천)T/L 건설사업
project_name_list154kV 기장-장안 송전선로 건설사업
purpose기장변전소 정전예방 및 동남권 방사선 의과학산단 등 기장군 일원 안정적 전력수급
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2019.10~2027.10
project_scale_rawACSR/AW 410㎟ × 단도체(S) × 2회선
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_983d27958fef64a8
  • ksnap_ec6fe59364fd7b5a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_fd4dc70374ca416a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fd4dc70374ca416a

Sources EV-f4878318a2904c145b79ef19
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 365777707844b5b70fb078f2c1170a76a5a6b6518502b58d1287f7badd092799

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel