POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 67items · current page 1–67 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-f4878318a2904c145b79ef19
Detailed source fields Original source field Published value or condition stable_project_id kproj_fd4dc70374ca416a stable_project_key prjtDef:232452:ESB project_definition 232452 first_region_code ESB manual_source_format false project_name 154kV 기장-장안(좌천)T/L 건설사업 project_name_list 154kV 기장-장안 송전선로 건설사업 purpose 기장변전소 정전예방 및 동남권 방사선 의과학산단 등 기장군 일원 안정적 전력수급 project_region_detail Gijang County, Busan Metropolitan City project_period_raw 2019.10~2027.10 project_scale_raw ACSR/AW 410㎟ × 단도체(S) × 2회선 responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_983d27958fef64a8 ksnap_ec6fe59364fd7b5a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_fd4dc70374ca416a
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fd4dc70374ca416a
Sources EV-f4878318a2904c145b79ef19 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 365777707844b5b70fb078f2c1170a76a5a6b6518502b58d1287f7badd092799 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232452|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_983d27958fef64a8
Sources EV-bd87453a82c3d8c84ffb9da4 Evidence SHA-256 e877c163df98493c305b8429391dca78ed9cb4941184856b23b6aac03fb6d9ea 행 SHA-256 bd04de00e0f31bfb74f6134d8181941c13c27a1f629c535c3c5b73c84575dfda Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2016-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2026-04-30 date_precision day assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2017-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2028-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2013-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-06-11 date_precision day assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-09-13 date_precision day assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2022-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2013-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232452|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_983d27958fef64a8
Sources EV-bd87453a82c3d8c84ffb9da4 Evidence SHA-256 e877c163df98493c305b8429391dca78ed9cb4941184856b23b6aac03fb6d9ea 행 SHA-256 bd04de00e0f31bfb74f6134d8181941c13c27a1f629c535c3c5b73c84575dfda Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2019-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2016-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2019-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2023-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232452|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_983d27958fef64a8 stable_project_id kproj_fd4dc70374ca416a source_key 202609|232452|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 기장-장안 송전선로 건설사업 project_name_detail 154kV 기장-장안(좌천)T/L 건설사업 region_summary_raw 부산광역시 기장군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 기장변전소 정전예방 및 동남권 방사선 의과학산단 등 기장군 일원 안정적 전력수급 Project region Gijang County, Busan Metropolitan City 사업 규모 ACSR/AW 410㎟ × 단도체(S) × 2회선 입지선정 전력입지영향평가 용역 착수: 2015.07 입지선정위원회 구성시기: 2015.08 참여 위원 수 : 12 지장유무 조회: 2016.09~2016.10 경과지(부지) 확정: 2017.03 환경/재해 영향평가 환경영향평가: 2016.03 ~ 2018.05 재해영향평가: 2016.05 ~ 2020.10 주민의견 수렴 지자체 공고 열람: 2018.09 ~ 설명회·공청회: 2018.09 자체설명회: 2018.10 ~ 입지선정 및 주민의견 수렴 주요 내용 □ ’13.08 : 제6차 장기 송배전설비계획 반영 ㅇ 기장-정관T/L 및 좌천분기T/L(준공목표 ’21.04) □ ’16.05 : 계통계획 변경 ㅇ (당초) 기장-정관T/L, 좌천분기T/L(기장-정관 2∏) → (변경) 기장-좌천T/L, 좌천분기T/L(명례-정관 2∏) □ ’18.09 : 사업시행계획 열람 공고 □ ’18.09 : 사업시행계획에 대한 주민설명회 무산 □ ’18.10 : 사업시행계획에 대한 주민설명회 생략 공고 □ ’18.10 : 사업시행계획에 대한 추가설명회 개최(기장지사) □ ’19.01 : 전원개발사업 실시계획 승인 신청 □ ’19.03∼’22.06 : 관계기관 및 지자체 의견조회 □ ’19.12 : 준공목표 변경(’21.04 → ’22.04) □ ’22.06 : 준공목표 변경(’22.04 → ’24.10) □ ’22.09 : 전원개발사업 실시계획 승인 및 관보 고시 ㅇ 산업통상자원부 고시 제2022-147호(’22.09.13) □ ’23.08 : 도급공사 착공 □ ’23.11 : 책임감리용역 착수 □ ’24.05 : 준공목표 변경(’24.10 → ’25.10) □ ’24.07 : 인·허가(하천점용허가) 최초 신청 □ ’24.09 : 전원개발사업 실시계획 변경 승인 신청 □ ’25.01 : 행정소송 추진 □ ’25.03 : 준공목표 변경(’25.10 → ’26.10) □ ’25.06 : 전원개발사업 실시계획 변경 승인 및 관보고시 ㅇ 산업통상자원부 고시 제2025-84호(’25.06.11) □ ’25.08 : 적정성 검토 자료 제출(준공목표 ’26.10 → ’27.10) □ ’25.12 : 기장읍 구간(No.2∼8) 개발행위허가 □ ’26.03 : 기장읍 구간(No.2∼8) 실착공 □ ’26.04 : 전원개발사업 실시계획 변경 신고 수리 및 관보고시 ㅇ 기후에너지환경부 고시 제2026-106호(’26.04.30) 사업설계 설계용역: 기본설계: 2020.05 ~ 실시설계: 2020.03 ~ 2020.05 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.08 공사 기간: 2023.08 ~ 2028.08 감독자: [redacted], 실적): 98, 37 future_plan_redacted □ 향후계획 □ '27.10 : 공사 준공 attachment_count 0 source_detail_sha256 e877c163df98493c305b8429391dca78ed9cb4941184856b23b6aac03fb6d9ea first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232452|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_983d27958fef64a8
Sources EV-bd87453a82c3d8c84ffb9da4 Evidence SHA-256 e877c163df98493c305b8429391dca78ed9cb4941184856b23b6aac03fb6d9ea 행 SHA-256 bd04de00e0f31bfb74f6134d8181941c13c27a1f629c535c3c5b73c84575dfda Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ec6fe59364fd7b5a stable_project_id kproj_fd4dc70374ca416a source_key 202610|232452|ESB basic_ym 202610 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 기장-장안 송전선로 건설사업 project_name_detail 154kV 기장-장안(좌천)T/L 건설사업 region_summary_raw 부산광역시 기장군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 기장변전소 정전예방 및 동남권 방사선 의과학산단 등 기장군 일원 안정적 전력수급 Project region Gijang County, Busan Metropolitan City 사업 규모 ACSR/AW 410㎟ × 단도체(S) × 2회선 계획확정 제06차 장기송변전설비계획 반영(2013.08) 입지선정 전력입지영향평가 용역 착수: 2015.07 입지선정위원회 구성시기: 2015.08 참여 위원 수 : 12 지장유무 조회: 2016.09~2016.10 경과지(부지) 확정: 2017.03 환경/재해 영향평가 환경영향평가: 2016.03 ~ 2018.05 재해영향평가: 2016.05 ~ 2020.10 주민의견 수렴 지자체 공고 열람: 2018.09 ~ 설명회·공청회: 2018.09 자체설명회: 2018.10 ~ 입지선정 및 주민의견 수렴 주요 내용 □ ’13.08 : 제6차 장기 송배전설비계획 반영 ㅇ 기장-정관T/L 및 좌천분기T/L(준공목표 ’21.04) □ ’16.05 : 계통계획 변경 ㅇ (당초) 기장-정관T/L, 좌천분기T/L(기장-정관 2∏) → (변경) 기장-좌천T/L, 좌천분기T/L(명례-정관 2∏) □ ’18.09 : 사업시행계획 열람 공고 □ ’18.09 : 사업시행계획에 대한 주민설명회 무산 □ ’18.10 : 사업시행계획에 대한 주민설명회 생략 공고 □ ’18.10 : 사업시행계획에 대한 추가설명회 개최(기장지사) □ ’19.01 : 전원개발사업 실시계획 승인 신청 □ ’19.03∼’22.06 : 관계기관 및 지자체 의견조회 □ ’19.12 : 준공목표 변경(’21.04 → ’22.04) □ ’22.06 : 준공목표 변경(’22.04 → ’24.10) □ ’22.09 : 전원개발사업 실시계획 승인 및 관보 고시 ㅇ 산업통상자원부 고시 제2022-147호(’22.09.13) □ ’23.08 : 도급공사 착공 □ ’23.11 : 책임감리용역 착수 □ ’24.05 : 준공목표 변경(’24.10 → ’25.10) □ ’24.07 : 인·허가(하천점용허가) 최초 신청 □ ’24.09 : 전원개발사업 실시계획 변경 승인 신청 □ ’25.01 : 행정소송 추진 □ ’25.03 : 준공목표 변경(’25.10 → ’26.10) □ ’25.06 : 전원개발사업 실시계획 변경 승인 및 관보고시 ㅇ 산업통상자원부 고시 제2025-84호(’25.06.11) □ ’25.08 : 적정성 검토 자료 제출(준공목표 ’26.10 → ’27.10) □ ’25.12 : 기장읍 구간(No.2∼8) 개발행위허가 □ ’26.03 : 기장읍 구간(No.2∼8) 실착공 □ ’26.04 : 전원개발사업 실시계획 변경 신고 수리 및 관보고시 ㅇ 기후에너지환경부 고시 제2026-106호(’26.04.30) 사업설계 설계용역: 기본설계: 2020.05 ~ 실시설계: 2020.03 ~ 2020.05 설계담당자: [redacted] 건설공사 개요 공사 착공: 2023.08 공사 기간: 2023.08 ~ 2028.08 감독자: [redacted], 실적): 98, 39 future_plan_redacted □ 향후계획 □ '27.10 : 공사 준공 attachment_count 0 source_detail_sha256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202610 source_record_id 202610|232452|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ec6fe59364fd7b5a
Sources EV-28a1d66176df0484dc66ac55 Evidence SHA-256 f86ef9f9c9a2c46d873f4fc0850eddb45476ee738f12c440c22039117b492d2a 행 SHA-256 a52831de2047ec8d3ebcadeca40f0c31d992edc3d9493f9cd8ef639bb7af4d1c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_fd4dc70374ca416a stable_project_key prjtDef:232452:ESB project_definition 232452 first_region_code ESB manual_source_format false project_name 154kV 기장-장안(좌천)T/L 건설사업 project_name_list 154kV 기장-장안 송전선로 건설사업 purpose 기장변전소 정전예방 및 동남권 방사선 의과학산단 등 기장군 일원 안정적 전력수급 project_region_detail Gijang County, Busan Metropolitan City project_period_raw 2019.10~2027.10 project_scale_raw ACSR/AW 410㎟ × 단도체(S) × 2회선 responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_983d27958fef64a8 ksnap_ec6fe59364fd7b5a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_fd4dc70374ca416a
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fd4dc70374ca416a
Sources EV-f4878318a2904c145b79ef19 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 365777707844b5b70fb078f2c1170a76a5a6b6518502b58d1287f7badd092799 Observations for this power asset History for this project