South Korea · Power project

154kV 군산-함열 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-adac9dd63c9b056dfea268a6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f0f1cb7e290626ae
stable_project_keyprjtDef:233654:ESB
project_definition233654
first_region_codeESB
manual_source_formatfalse
project_name154kV 군산-함열 지중T/L 건설사업
project_name_list154kV 군산-함열 지중T/L 건설사업
purpose새만금지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 익산시,군산시
project_period_raw2021.10~2027.12
project_scale_raw154㎸ XLPE 2500㎟, 2C × 9.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e289dc5ee7a4bc0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f0f1cb7e290626ae

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f0f1cb7e290626ae

Sources EV-adac9dd63c9b056dfea268a6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f66209857a7effaac278ba2300adfb6ec1543394f7a9e9336610ac07f30b80da

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel